Cost Incentives for Wind Energy

Base Price 65 kW 3-phase
$130,000.00
Single Phase 40 kW (optional)
$12,500.00
S.C.A.D.A. (optional)
$5,000.00
Trenching & Wire to service connection greater than 250 ft. $ 6.0/foot
Excise Tax (South Dakota)
2%
Extra work -Foundation
(blasting, non-native backfill, etc...)
TBD
Extra work -Access improvements necessary
to approach the site...
TBD
1 Year Warranty Parts & Labor
Maintenance Contract Available
Permits, Utility Agreements & Studies as well as utility system upgrades may be necessary and are the responsibility of the customer. IES will provide documentation and consulting as needed to help expedite these requirements.
 
       
Payment Terms
20% Down at contract date
 
40% Due at Foundation Completion
 
40% Final Payment due at Commissioning
 
Windmaster 65 Package Price
Cost Incentives for Wind Energy
Base Price 65 kW 3-phase
$85,000.00
Single Phase 40 kW (optional)
$12,500.00
S.C.A.D.A. (optional)
$5,000.00
Sales Tax (South Dakota)
4%
1 Year Warranty
Permits, Utility Agreements & Studies as well as utility system upgrades may be necessary and are the responsibility of the customer. IES will provide documentation and consulting as needed to help expedite these requirements.
   
Payment Terms
100% FOB

WIND ENERGY Rate of Return Calculations

Assumptions:
  • Configured as 65 kW 480V three-phase

  • Average annual wind speed of 15.7 mph (Rayleigh Distribution Class 4)

  • All power produced is used by customer, yielding retail power savings of $.785/kWh

  • Project cost reduced by 30% with Federal Investment Tax Credit

  • Project cost reduced by 25% with USDA "Small Wind" Grant 

  • Project cost reduced by $15,000 "green tag" sale

 
65kW
X 24 hours
= 1560 kWh

 (Theoretical Daily Output)

1560 kWh
X 365 days
= 569,400 kWh

 (Theoretical Annual Output)

170,820 kWh
X .30 capacity
= 170,820 kWh 

 (Actual Output)

170,820 kWh
X $.0785/kWh
= $13,409
(Cost Recovered per year)
$43,500 Adjusted Price
/ $13,409
= 3.24 Years
(Cost Recovery Time using all incentives)

Note: Above calculations are for illustration purposes only and are not guaranteed. Every installation is different and subject to natural forces which are only nominally predictable.

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

About Us

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Wind Turbine

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Wind Energy

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Best Prices

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Contact Us

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

windmaster.us | about us | products & services | wind energy | pricing | contact us |sitemap

Copyright 2009 Impervious Energy Systems, LLC